WATER PROOFING TREATMENT OF ROOF SLAB [A STEP BY STEP GUIDE]

Water Proofing Treatment of Roof Slab

In this method polymer modified cementitious slurry coatings are applied over the base concrete. This technique of waterproofing is latest development in the field of waterproofing.

Polymer imparts significant improvement in impermeability.

聚合物改性的胶结浆具有与混凝土非常相似的膨胀系数,因此由于混凝土的热变化而不会破裂。

Polymer modified cementitious slurry coatings consist of a liquid blend and a dry blend. The liquid blend consists of the polymer, liquid additives, and clean water. Dry blend consists of locally available Portland cement and aggregates.

These blends are mixed in specified ratio generally 2:1 (cement: polymer) by weight and applied by brush on a prepared clean surface.

Generally, two coats are provided. However, manufacturer’s recommendations should be followed in this regard.

To impart more flexibility, it is desirable to use some reinforcement like fibre glass cloth sandwiched between two coats.

This coating should be covered by screed concrete to protect it against physical damage.

该系统可用于新的和旧的屋顶。

该系统的应用涉及以下步骤。

i) Preparation of roof surface:

The surface shall be cleaned to remove all dust, foreign matters, lose materials or any other deposits of contamination. Cracks and depression shall be filled up by fillers. Prepared surface shall be thoroughly pre wetted for one hour.

ii) Preparation of polymer modified cementitious slurry:

Dry blend and liquid blend shall be mix into the desired ratio as per recommendation of supplier. The mix shall be stirred thoroughly, until no bubbles remain in the mix. Any lump found in mix shall be removed.

iii)使用第一层:

First coat of polymer modified cementitious slurry shall be applied by brush on wet cleaned surface.

iv) Laying fibre glass cloth:

Subsequently, fibre glass cloth shall be laid over first coat of polymer modified cementitious slurry.

v)第二涂层的应用:

Second coat of polymer modified cementitious slurry shall be laid over fibre glass cloth in a criss-cross direction to the previous coat.

The minimum thickness of the dry film of complete application should not be less than as recommended by manufacturer’s specification

vi) Application of brush topping:

聚合物修饰的胶结刷浇了层应在第二层聚合物改性涂层上涂抹。

vii) Application of screed concrete:

On brush topping, screed concrete, admixed with suitable integral water proofing compound 25 to 40mm thick to a min. slope of 1 in 100 (or as per drawing), with aggregate size down 10mm with maximum water cement ratio 0.45, shall be laid.

Above system may slightly differ from case to case depending upon the instruction of supplier of water proofing system.

viii) At Junction of parapet wall and roof

The fillet (angular or concave, not convex) of adequate size should be provided all along the junction of parapet wall with roof.

Water proofing system should be extended from roof to parapet wall for a minimum height of 150 mm with a chase.

water proofing treatment of roof slab

Note:

由于没有相关的印度人或任何其他可用标准,因此需要仔细采用该系统。应按照制造商/供应商的说明进行工作。建议用户从制造商那里收集完整的文献,并在应用治疗之前仔细研究