|Concrete Placing Precautions
具体的,因为它是out of the mixer or as it is ready for use on the platform, is to be transported and placed on the formwork.
Following precautions should be taken during placing of concrete.
- The formwork or the surface which is to receive the fresh concrete should be properly cleaned, prepared and well watered.
- It is desirable to deposit concrete as near as practicable to its final position.
- The large quantities of concrete should not be deposited at a time. Otherwise the concrete will start to flow along the formwork and consequently the resulting concrete will not have uniform composition.
- The concrete should be dropped vertically from a reasonable height. For vertical laying of concrete, care should be taken to use stiff mix. Otherwise the bleeding of concrete through cracks in forms will take place. The term bleeding is used to mean the diffusion or running of concrete through formwork.
- The concrete should be deposited in horizontal layers of about 150 mm height. For mass concrete, the layers may be of 400 mm to 500 mm height. The accumulation of excess water in upper layers is known as the laitance and it should be prevented by using shallow layers with stiff mix or by putting dry batches of concrete to absorb the excess water.
- As far as possible, the concrete should be placed in single thickness. In case of deep sections, the concrete should be placed in successive horizontal layers and proper care should be taken to develop enough bond between successive layers.
- The concrete should be thoroughly worked around the reinforcement and tapped in such a way that no honeycombed surface appears on removal of the formwork. The term honeycomb is used to mean comb or mass of waxy cells formed by bees in which they store their honey. Hence, if this precaution is not taken, the concrete surface so formed would have a honeycomb like surface.
- 混凝土应尽快放置在模板上。但在任何情况下,它应该在其准备30分钟后放置。
- During placing, it should be seen that all edges and corners of concrete surface remain unbroken, sharp and straight in line.
- The placing of concrete should be carries out uninterrupted between predetermined construction joints.
4评论
good points
very good blog very significant notes thxs for yr caring
非常丰富的博客!在具体的放置方面取得了很多好点。当您在进行拖动施工过程时,应特别牢记第1点,因为滑动需要适当的操作。顺便说一下,您知道执行此操作所需的适当工具和设备。昨天,我遇到了一个博客,谈论建筑的大量举措:新利18体育官网登录
http://www.bygging-uddemann.se/basic-heavy-lifting-application-for-construction/
您是否认为他们提到的一些工具可以在此操作中发挥作用。
Great Information !!
Concrete is a highly durable and sustainable building material.The placement of concrete is very vital process. It determines the success and durability of the structure.The placement of concrete is very vital process. It determines the success and durability of the structure.
To know more please visit:http://www.mapleconcretepumping.ca/factors-responsible-for-concrete-sustainability/